UK theme parks from another point of view!

  • 1
  • 3
  • 4
  • 5
  • 6
  • 7
 
Sam198
TT Member
TT Member
Posts: 1126
Joined: October 2012

Re: Ring°Racer - Finally Open!

Sat Nov 02, 2013 7:11 pm

Ilovecoasters wrote:
So why did it take so long?


Put simply, the pneumatic launch system was deeply flawed (hence the initial delayed opening and reduction from 0-135mph in 2.5 seconds to 99 in 2), and then in 2009 it exploded, injuring 7 people and causing a considerable amount of damage to the buildings surrounding it.
 
User avatar
Mark.aa
TT Member
TT Member
Posts: 74
Joined: March 2013
Location: Basingstoke

Ring racer nurburgring Germany.

Sun Jun 08, 2014 10:42 pm

Gutted going on a motorbike tour of Europe and was going to go on the ring racer launch coaster at the nurburgring ,just found out the new owners have decided that it's not economically viable so it's not running anymore,
Another s&s power ride bites the dust!
 
User avatar
Mark.aa
TT Member
TT Member
Posts: 74
Joined: March 2013
Location: Basingstoke

Re: Ring racer nurburgring Germany.

Sun Jun 29, 2014 11:58 pm

Found out when i when't it had only been used for 3days.
Track still had paint on guide rails
 
User avatar
timmy1372
TT Member
TT Member
Posts: 396
Joined: April 2005
Location: Somerset

Re: Nurburgring

Sun Dec 17, 2017 6:51 pm

I just found this in German. 25/7/17 "Markforts predecessor wanted to tear down the ring racer. "We will check in winter if there is a way to operate it economically. Demolition is the last option." " I can't believe it's basically stood there not operating for almost 10 years, they finally got it working too, then mothballed it after less than a week of operation because it was the end of the 2013 season! Crazy waste of money, they just aswell finally makes some money out of if it's economically viable. There may be life in the ring racer yet!
 
streetmagix
TT Member
TT Member
Posts: 143
Joined: April 2016
Location: London, UK

Re: Nurburgring

Wed Dec 20, 2017 6:15 am

I thought it was closed as the track changed owners at the end of 2013? The new owners didn't invest in the ride directly and didn't see the track as an amusement park so they stopped running it. A shame really but understandable from a pure business point of view.
 
User avatar
timmy1372
TT Member
TT Member
Posts: 396
Joined: April 2005
Location: Somerset

Re: Nurburgring

Wed Dec 20, 2017 12:57 pm

Exactly, but the managing director of said company has been replaced and the new director has been quoted saying earlier this year "We will check in winter if there is a way to operate it economically. Demolition is the last option"
 
User avatar
Adz
Team Admin
Team Admin
Posts: 7129
Joined: November 2003
Location: Yorkshire
Contact:

Re: Nurburgring

Wed Dec 20, 2017 5:35 pm

It also stopped operating because during a launch it shattered the glass windows of the building. They weren't able to remove it because the entire building is designed around it otherwise it would already be long gone. Hopefully something can be done with it but I'm not going to hold my breath. 

It's basically a huge and unreliable pile of arse, which was to be expected of S&S at the time. 
Image
Image
Image
  • 1
  • 3
  • 4
  • 5
  • 6
  • 7

Who is online

Users browsing this forum: No registered users and 43 guests