UK theme parks from another point of view!

  • 1
  • 2
  • 3
  • 4
  • 5
  • 44
 
User avatar
lewis97
Team TTSP
Team TTSP
Posts: 4121
Joined: November 2012
Location: Hertfordshire / York

Re: SW8 Construction Discussion

Thu Apr 06, 2017 9:06 pm

scruffy_ wrote:
i'm predicting a lot of water around/under this ride!

If they were planning on having water features, would they have to be on the plans? or does it come under theming?

When the original application for SW8 was approved there were a number of conditions attached, with one of them (Condition 4) stipulating that the Resort must submit details of drainage works prior to commencing the development - this was fulfilled last year when the document below was submitted. As far as I'm aware this would have also been indicative of any bodies of water, and none are shown on this plan, nor on any of the other plans relating to SW8, so I do not believe that we'll see a lot, if any water around the ride.

Image
Image
 
User avatar
Dan
Community Advocate
Community Advocate
Posts: 1903
Joined: June 2009

Re: SW8 Construction Discussion

Fri Apr 07, 2017 7:54 pm

A new SW8 construction update has been posted to the TowersTimes Facebook page.

The site has changed dramatically since opening weekend with more metalwork being installed in preparation for the rollercoasters foundations along with more concrete pouring being done.

A large hole is also developing around where the turntable used to be for The Flume.
Image
Image
Image
Image
 
User avatar
xylyx
TT Member
TT Member
Posts: 427
Joined: February 2013
Location: Chesterfield

Re: SW8 Construction Discussion

Sat Apr 08, 2017 9:32 am

This was my view over the site yesterday I was intrigued to see they'd filled the hole that was shown on TPWW's construction update as that's a hefty foundation, but for what?

Image
 
User avatar
lewis97
Team TTSP
Team TTSP
Posts: 4121
Joined: November 2012
Location: Hertfordshire / York

Re: SW8 Construction Discussion

Sat Apr 08, 2017 9:50 am

xylyx wrote:
This was my view over the site yesterday I was intrigued to see they'd filled the hole that was shown on TPWW's construction update as that's a hefty foundation, but for what?

Although it's a little tricky to figure out it's exact location, it looks like it could potentially be the foundation for the theming feature in 'Theming Envelope 2' (rumoured to be a large Wicker Man statue thing) on the following plan.

Image
Image
 
User avatar
xylyx
TT Member
TT Member
Posts: 427
Joined: February 2013
Location: Chesterfield

Re: SW8 Construction Discussion

Sat Apr 08, 2017 3:41 pm

That looks about right and it's oriented correctly hmmmm that trench was massive so it's something hefty. I wonder if we'll pass through the legs of it on the way around......
 
User avatar
Chris
Team Admin
Team Admin
Topic Author
Posts: 1863
Joined: March 2003
Location: London
Contact:

Re: SW8 Construction Discussion

Sat Apr 08, 2017 11:45 pm

Seems like they are getting great weather for the major foundations of the ride - which shouldn't lead to issues later on with soft concrete. (Example= Smiler!)
Image
 
User avatar
DeadJack5
TT Member
TT Member
Posts: 316
Joined: March 2012
Location: The Pits
Contact:

Re: SW8 Construction Discussion

Sun Apr 09, 2017 7:17 pm

Just some pictures from the viewing windows i managed to get today.

Image

Image

Image

Image
 
User avatar
Jack
Community Advocate
Community Advocate
Posts: 2878
Joined: December 2012
Location: Solihull

Re: SW8 Construction Discussion

Mon Apr 10, 2017 11:42 pm

More images from Sunday :)

Image

Image

Image

Image

Image

Image
Image
Image
 
User avatar
simononestop
TT Member
TT Member
Posts: 183
Joined: June 2009
Location: Hastings

Re: SW8 Construction Discussion

Tue Apr 11, 2017 8:05 am

lol

Image
 
User avatar
Burniel
TT Member
TT Member
Posts: 3149
Joined: June 2013
Location: Dragon's Fury's SRQ

Re: SW8 Construction Discussion

Tue Apr 11, 2017 8:06 am

Yeah ... good luck with that one, Towers. :P
Rides on Dragon's Fury since SRQ installed:

2016: 17 | 2017: 35
 
User avatar
Liam.W
TT Member
TT Member
Posts: 1022
Joined: March 2015
Location: Rotherham

Re: SW8 Construction Discussion

Tue Apr 11, 2017 6:06 pm

GCI will be on site in about 2 weeks according to the end of this interview with the president of GCI, Clair Hain Jr.

Watch it here!
Ride count 2017: 346!
Ride count since the beginning of 2015: 857!
Cred count: 65!

Image
 
User avatar
Ryan.B
TT Member
TT Member
Posts: 1511
Joined: August 2014

Re: SW8 Construction Discussion

Wed Apr 12, 2017 12:17 am

So they put in windows, and expect us not to take photos? Got to be having a laugh there...
Image
Credit to NemesisRider for the absolutely AMAZING signature!
My Facebook theme park media page https://www.facebook.com/pages/Global-T ... 6462963458
My Website http://globalthemeparkmedia.boards.net
 
User avatar
Bert2theSpark
TT Member
TT Member
Posts: 135
Joined: March 2017
Location: Somewhere

Re: SW8 Construction Discussion

Wed Apr 12, 2017 8:35 am

Well I think the sign is for the worker on-site as the sign is in German too. The only non-English sign in the park. This is probably to avoid what happened with the demolished flume/wickerman photos. They still let me take photos through the window and SW8 is attracting alot of attention now. The sign was probably put in before the windows and they have not took the sign down since.
[Insert Signature Here]
 
User avatar
Owen
Community Advocate
Community Advocate
Posts: 3240
Joined: March 2012
Location: Hastings

Re: SW8 Construction Discussion

Wed Apr 12, 2017 9:34 am

Or they're pulling a Cedar Point :P
Image
Image
Image
 
Dan_Roe
TT Member
TT Member
Posts: 21
Joined: March 2017
Location: Manchester

Re: SW8 Construction Discussion

Wed Apr 12, 2017 1:05 pm

When you try to hide your building SW8 but everyone knows your building it anyway :lol
 
User avatar
NeoXIII
TT Member
TT Member
Posts: 123
Joined: January 2016
Location: Stafford

Re: SW8 Construction Discussion

Wed Apr 12, 2017 3:21 pm

simononestop wrote:
lol

Image


That's some very bad translated German, where did they get that from?
Tempted to sneak onto the site and correct it myself now! XD
 
User avatar
Morgan
TT Member
TT Member
Posts: 1990
Joined: September 2014
Location: Altonville Mines

Re: SW8 Construction Discussion

Wed Apr 12, 2017 5:55 pm

I'd think that sign is to prevent workers from taking any pictures inside the site so that they can keep some stuff secret. I believe Grufallo had similar signs :)
Image
 
Disneyland Dreamer
TT Member
TT Member
Posts: 15
Joined: April 2017

Re: SW8 Construction Discussion

Wed Apr 12, 2017 7:07 pm

I'll take a few pics Friday :) Hello all!
 
User avatar
lewis97
Team TTSP
Team TTSP
Posts: 4121
Joined: November 2012
Location: Hertfordshire / York

Re: SW8 Construction Discussion

Wed Apr 12, 2017 7:34 pm

Disneyland Dreamer wrote:
I'll take a few pics Friday :) Hello all!

Good to see you've finally made it :P I look forward to seeing the photos later this week!
Image
 
Disneyland Dreamer
TT Member
TT Member
Posts: 15
Joined: April 2017

Re: SW8 Construction Discussion

Wed Apr 12, 2017 9:18 pm

Oh, there will be photos on Friday :)
  • 1
  • 2
  • 3
  • 4
  • 5
  • 44

Who is online

Users browsing this forum: awalker, bensaund, Bert2theSpark, Sawboss, sayhellotorich and 33 guests