UK theme parks from another point of view!

 
User avatar
Owen
Community Advocate
Community Advocate
Posts: 3233
Joined: March 2012
Location: Hastings

Re: SW8 Construction Discussion

Fri Aug 04, 2017 10:19 am

ATI wrote:
I spy airtime!


Not sure I'd count on that being the case here :lol

What seems to be the queue line shop has also begun construction...

Image

Image

Credit to TowersStreet.
Image
Image
Image
 
User avatar
118hazaman
TT Member
TT Member
Posts: 103
Joined: March 2013
Contact:

Re: SW8 Construction Discussion

Fri Aug 04, 2017 12:24 pm

The real question is: How long will it take before the queue line shop becomes a set of vending machines?  :-k
Image
 
User avatar
jackf1tz
TT Member
TT Member
Posts: 112
Joined: August 2017
Location: Journeying Beyond

Re: SW8 Construction Discussion

Fri Aug 04, 2017 12:27 pm

Approximately 15 seconds.
This ride is perfectly safe. Everything has been designed for your comfort, and enjoyment.
 
User avatar
Smiler313
TT Member
TT Member
Posts: 273
Joined: July 2016
Location: In The Smiler's Baggage Hold

Re: SW8 Construction Discussion

Fri Aug 04, 2017 3:26 pm

:lol :lol
Realistically though I believe it will be for the 2019 season.
Image
Image
'You are now embarking on an Optical procedure'
 
User avatar
bendaboss
TT Member
TT Member
Posts: 29
Joined: March 2016

Re: SW8 Construction Discussion

Fri Aug 04, 2017 4:42 pm

Robert W wrote:
Towers Street always has good photos! For me, it's the roofing that makes it obvious that the ride should be in Gloomy Wood...

Thats what i was thinking! I would also love a new ride in gloomy wood, and a coaster is perfect!
and Oh my God! SW8 is going to have an early release (hopefully!).
You belong to the smiler...Welcome to oblivion...NEMESIS!
 
User avatar
Adam.W
TT Member
TT Member
Posts: 783
Joined: October 2014

Re: SW8 Construction Discussion

Fri Aug 04, 2017 5:14 pm

These pictures confirm that Universal Rocks will almost certainly be working on the theming structure, at least.
Image
Image
Credit to Theme Park Guide
 
User avatar
lewis97
Team TTSP
Team TTSP
Posts: 4124
Joined: November 2012
Location: Hertfordshire / York

Re: SW8 Construction Discussion

Fri Aug 04, 2017 7:36 pm

Theme Park Worldwide have posted a couple of photos showing today's progress on the pre-show building as well as the addition of bents in the vicinity of the queue-line shop.

Image

Image
Image
 
User avatar
Smiler313
TT Member
TT Member
Posts: 273
Joined: July 2016
Location: In The Smiler's Baggage Hold

Re: SW8 Construction Discussion

Fri Aug 04, 2017 7:38 pm

Maybe the architecture and design of the preshow building may give some clues? It may be a little early on to tell.
Image
Image
'You are now embarking on an Optical procedure'
 
User avatar
lewis97
Team TTSP
Team TTSP
Posts: 4124
Joined: November 2012
Location: Hertfordshire / York

Re: SW8 Construction Discussion

Fri Aug 04, 2017 7:42 pm

I do think the height of the actual pre-show area is curious, and will no doubt be utilised by whatever show sequence is inside. From the plans, the lower section appears to contain the baggage area and somewhere to hold guests prior to entering the pre-show.

Image
Image
 
User avatar
xylyx
TT Member
TT Member
Posts: 427
Joined: February 2013
Location: Chesterfield

Re: SW8 Construction Discussion

Fri Aug 04, 2017 9:13 pm

I waa on park today and grabbed some pics though all prettu similar to what's been posted already. I did manage to grab a close up of the wire mesh thats on the theming structure Image

And marvelled (without pics) at the banking thats going on further down the first drop. Looks like youre going to be swayinf drom side to side.
 
User avatar
T0mPr1ce
TT Member
TT Member
Posts: 111
Joined: December 2016

Re: SW8 Construction Discussion

Sat Aug 05, 2017 8:19 pm

The preshow building structure looks very church-y
 
User avatar
Robert.W
TT Member
TT Member
Posts: 323
Joined: May 2017

Re: SW8 Construction Discussion

Sat Aug 05, 2017 10:34 pm

T0mPr1ce wrote:
The preshow building structure looks very church-y

Now you've pointed that out, it really does!
Image
 
User avatar
Owen
Community Advocate
Community Advocate
Posts: 3233
Joined: March 2012
Location: Hastings

Re: SW8 Construction Discussion

Sun Aug 06, 2017 3:00 pm

Here's a sneak peak from TPG of the theming element. To me it looks like wood or spiky rocks...

Image


Also this image popped up in a discord server showing the turn around half way through the course...

Image

I'm sure you have noted the complete lack of banking on the turn which would suggest a low speed at this point, hopefully this is for a reason or another banked section will be added on top, rather than the coaster slowing down... :nervious:
Image
Image
Image
 
User avatar
Justin
Community Advocate
Community Advocate
Posts: 1122
Joined: April 2014

Re: SW8 Construction Discussion

Sun Aug 06, 2017 3:19 pm

There is a further update from Theme Park Guide due soon. Now you mention it, Owen, it looks more like bent wood panels and not so much like the spikes originally seen!
Image
Image
Image
Image
 
User avatar
Justin
Community Advocate
Community Advocate
Posts: 1122
Joined: April 2014

Re: SW8 Construction Discussion

Sun Aug 06, 2017 4:59 pm

Theme Park Guide has updated their construction page with lots of images from the construction of SW8. I've posted a few of the theming structure below.

Image

Image

Image

Image

Image
Image
Image
Image
Image
 
User avatar
Capt. Barnacles
TT Member
TT Member
Posts: 790
Joined: November 2012
Location: Stoke-on-Trent

Re: SW8 Construction Discussion

Sun Aug 06, 2017 6:03 pm

Considering those black parts are see through, they're not wooden planks... most likely wire mesh wrapped ready for rendering, so at this point, could still be anything.
Image
Image
Keep up with Virtual Towers Online on our social media!
 
User avatar
PhNx Survivor
TT Member
TT Member
Posts: 115
Joined: November 2012
Location: Derby

Re: SW8 Construction Discussion

Sun Aug 06, 2017 6:16 pm

Thoses covers that state Alton (followed by a number), I would not be surprised if that is track work.

Also the look of that roof tiling, and the new structure being built along with the new see through mesh? I can't place my finger on what this theme will be :|
 
User avatar
DeadJack5
TT Member
TT Member
Posts: 316
Joined: March 2012
Location: The Pits
Contact:

Re: SW8 Construction Discussion

Sun Aug 06, 2017 8:07 pm

Some of my friends visited Friday and shared some photos with me from their visit.

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image


I don't think these photos show much but just some mainly from the rapids exit
Image
 
Prantel
TT Member
TT Member
Posts: 1
Joined: August 2017

Re: SW8 Construction Discussion

Mon Aug 07, 2017 4:48 am

Is it just me or does the theme structure look like burnt wood? If it does then surely it's going to use smoke and fire effects to simulate going through a burning structure.

Would make for a very intense near miss, fire experience.
 
User avatar
darrenhosker
TT Member
TT Member
Posts: 40
Joined: March 2004
Location: Bradford
Contact:

Re: SW8 Construction Discussion

Tue Aug 08, 2017 2:30 am

I was thinking the same thing, it looks like burnt timber. Or my first thought was a burnt boat/ship hull.

Who is online

Users browsing this forum: 118hazaman, Birdy, Dan, ROYJESS, Sawboss and 28 guests