Fri Apr 21, 2017 12:04 am

Not 100% but I believe they could be moulds for footers. Like you say, big - but who knows at this point :P
Image
Image
Image
 
User avatar
1991troysmith
TT Member
TT Member
Posts: 4
Joined: June 2016

Re: SW8 Construction Discussion

Fri Apr 21, 2017 12:29 am

Image


Does anyone else believe that this ground breaking ride may be going underground at any point? even on this picture it appears to be some sort of tunnel for access, maybe for health and safety reasons? Along with these concrete tunnels with ladders [picture below] v Could possibly be stacked onto each other as one, to form evacuation access or maintenance access.

Image

Maybe part of underground works were carried out within closed season before pictures were taken, who knows? If the tube station can be built under a entire city, Anything can happen. I'm going on now.


Sent from my iPhone using Tapatalk
 
TheDuke
TT Member
TT Member
Posts: 132
Joined: December 2016
Location: Dublin

Re: SW8 Construction Discussion

Fri Apr 21, 2017 11:58 am

T0mPr1ce wrote:
Great pictures. Does anyone know what those concrete cylinders are for? They've been in that spot there for some time, I originally thought they could be pre-made footers. However, they are too large for wooden coaster footers. I think some have ladder rungs in the insides, could they be for underground pipes?


Theyre usually used as part of foundations, they could be buried under the footers to add support but they can be used for a lot of things
 
User avatar
lewis97
Team TTSP
Team TTSP
Posts: 4121
Joined: November 2012
Location: Hertfordshire / York

Re: SW8 Construction Discussion

Fri Apr 21, 2017 1:21 pm

The concrete rings with the yellow steps are precast manhole chambers. There's a few pictures showing the installation process here.
Image
 
User avatar
T0mPr1ce
TT Member
TT Member
Posts: 111
Joined: December 2016

Re: SW8 Construction Discussion

Fri Apr 21, 2017 2:42 pm

It's definitely highly plausible that part of this ride is gong to be underground, there are many things pointing towards it. I'm a bit confused over the station area as the original application shows the building above ground, and we've seen a list of materials for the exterior of the buildings. The current building structure is pretty much fully under the ground level currently. This could mean what we can see at the moment is a base floor, and there could be an external facade which we will enter and go downstairs to the station. Obviously this is all speculation :lol

An underground section and a huge theming element (with fire effects). I believe this ride could be really fantastic and I can't wait to see more progress with the site in the coming months.
 
User avatar
Owen
Community Advocate
Community Advocate
Posts: 3240
Joined: March 2012
Location: Hastings

Re: SW8 Construction Discussion

Fri Apr 21, 2017 3:58 pm

Remember there's still a lot of landscaping that will take place and so what may seem as below ground level now may not be once the final product is complete.

Personally I think people are reading into the wording of "Ground Breaking" and that the ride will follow the plans, which doesn't indicate any underground portions. :)
Image
Image
Image
 
Speedy_no1
TT Member
TT Member
Posts: 62
Joined: April 2014

Re: SW8 Construction Discussion

Fri Apr 21, 2017 5:13 pm

Would of been good if they reused the flume underground section.


Sent from my iPhone using Tapatalk
 
User avatar
AltonOperator
TT Member
TT Member
Posts: 94
Joined: March 2017
Location: The Th13teen crypt having tea with James

Re: SW8 Construction Discussion

Fri Apr 21, 2017 5:44 pm

I love the idea of the underground section!

Speedy_no1 wrote:
Would of been good if they reused the flume underground section.


I wasn't Aware it had an underground section. Do you mean the indoor bit?
GodBlessTeaTowels
 
Speedy_no1
TT Member
TT Member
Posts: 62
Joined: April 2014

Re: SW8 Construction Discussion

Fri Apr 21, 2017 8:59 pm

The dark section was under the ground with the big scary duck. The tunnel is still there.


Sent from my iPhone using Tapatalk
 
selbjx
TT Member
TT Member
Posts: 1
Joined: April 2017

Re: SW8 Construction Discussion

Fri Apr 21, 2017 9:48 pm

The tunnel I believe you are referring to is actually a digger bucket (can be seen in other photos) and the concrete cast sections are standard drainage or plant room type access.
 
User avatar
T0mPr1ce
TT Member
TT Member
Posts: 111
Joined: December 2016

Re: SW8 Construction Discussion

Fri Apr 21, 2017 11:56 pm

Speedy_no1 wrote:
The dark section was under the ground with the big scary duck. The tunnel is still there.


No part of the flume was underground, this was an indoor section, of which part of the trough remains next to the new footpath.
 
User avatar
Ryan.B
TT Member
TT Member
Posts: 1511
Joined: August 2014

Re: SW8 Construction Discussion

Sat Apr 22, 2017 2:02 am

it goes under the landscape in that area as far as i'm aware. I remember hearing in closed season they had to sort out the rapid's system before any major work could start on SW8. maybe it's to do with that or possibly Sharkbait Reef. surely the fish won't be ok with the coaster in operation though?
Image
Credit to NemesisRider for the absolutely AMAZING signature!
My Facebook theme park media page https://www.facebook.com/pages/Global-T ... 6462963458
My Website http://globalthemeparkmedia.boards.net
 
User avatar
jayson2125
TT Member
TT Member
Posts: 467
Joined: June 2003
Location: Manchester
Contact:

Re: SW8 Construction Discussion

Mon Apr 24, 2017 9:19 pm

the tunnel is still there from the flume... took these pics last week and the tunnel is below the nearest trough

Image

Image
 
User avatar
simononestop
TT Member
TT Member
Posts: 183
Joined: June 2009
Location: Hastings

Re: SW8 Construction Discussion

Thu May 04, 2017 12:44 pm

oh so quiet? no recent updates
 
User avatar
Dan
Community Advocate
Community Advocate
Posts: 1905
Joined: June 2009

Re: SW8 Construction Discussion

Thu May 04, 2017 12:50 pm

simononestop wrote:
oh so quiet? no recent updates


There'll be a heavy TTSP presence on park this weekend so expect plenty of updates :)
Image
Image
Image
Image
 
User avatar
T0mPr1ce
TT Member
TT Member
Posts: 111
Joined: December 2016

Re: SW8 Construction Discussion

Thu May 04, 2017 5:30 pm

GCI are now onsite. It's reported that there has also been a delivery of wood.
 
awalker
TT Member
TT Member
Posts: 2
Joined: January 2015

Re: SW8 Construction Discussion

Fri May 05, 2017 9:05 am

T0mPr1ce wrote:
It's reported that there has also been a delivery of wood.

That's what she said.
 
User avatar
MakoMania
TT Member
TT Member
Posts: 1347
Joined: February 2015
Location: Who knows?

Re: SW8 Construction Discussion

Fri May 05, 2017 11:59 am

nice one :roll:

This is gonna be a long 10 months.......
Image
Thanks to Nemesis Rider for the signature!

Infinity Falls; World's tallest river rapids opening summer 2018 at SeaWorld Orlando!
SeaWorld has rescued over 31,000 animals in need!
 
User avatar
Tom170499
TT Member
TT Member
Posts: 380
Joined: January 2013
Location: Leeds

Re: SW8 Construction Discussion

Fri May 05, 2017 1:14 pm

awalker wrote:
T0mPr1ce wrote:
It's reported that there has also been a delivery of wood.

That's what she said.


With that being your first post, I have to ask, did our create an account just to say that? :lol
Image
 
User avatar
lewis97
Team TTSP
Team TTSP
Posts: 4121
Joined: November 2012
Location: Hertfordshire / York

Re: SW8 Construction Discussion

Fri May 05, 2017 1:58 pm

A construction update has been posted on TowersTimes Facebook, with a selection of images below.

Image

Image

Image