clayj wrote:Top section...
I think from lift hill to 1st drop after lift hill is self explanitory regarding the inversion... But when you look after the drop from the second lift hill (vertical) and follow the plates on the supports from 1, 2, 3, then, oh look, 4 is past horizontal... Another diving drop ?
clayj wrote:Top section...
I think from lift hill to 1st drop after lift hill is self explanitory regarding the inversion... But when you look after the drop from the second lift hill (vertical) and follow the plates on the supports from 1, 2, 3, then, oh look, 4 is past horizontal... Another diving drop ?
PhNx Survivor wrote:Well... high resolution photo 6 shows clearly that framework for maintenance building is now in construction
*bottom right*
tigzie1 wrote:
Anyone know what this is for? It's been there since it snowed ont he original High rez images and is still there on the new ones.
RCT3Bross wrote:tigzie1 wrote:
Anyone know what this is for? It's been there since it snowed ont he original High rez images and is still there on the new ones.
I've been seeing this a long time too and my guess it's for the brakes but can't be installed yet since the station building isn't far enough yet.
simononestop wrote:worryingly still quite a bit of water in bottom,the first drop from station, the straight under the first lift hill and the plazza?
Also where do you get on the train and off? you can see the floor being costructed (pict 5) next to the station before the first drop. it just seems to be in a corner you normall enter one side exit the other?? not sure?
like this ???
chrisbacktothe80s wrote:My first post, so as always prob wrong but looking at the hi-res pics it appears people are right, and the spider will move as well as having some sort of effect as can be seen by the 3/4 hydrolic lines in front of the cement pump as well as the blue gas/water pipe leading from the pressure vessel towards the same place as the hydrolic lines ?
simononestop wrote:worryingly still quite a bit of water in bottom,the first drop from station, the straight under the first lift hill and the plazza?
Also where do you get on the train and off? you can see the floor being costructed (pict 5) next to the station before the first drop. it just seems to be in a corner you normall enter one side exit the other?? not sure?
like this ???
RCT3Bross wrote:simononestop wrote:worryingly still quite a bit of water in bottom,the first drop from station, the straight under the first lift hill and the plazza?
Also where do you get on the train and off? you can see the floor being costructed (pict 5) next to the station before the first drop. it just seems to be in a corner you normall enter one side exit the other?? not sure?
like this ???
If you look at the game sneak peak it looks to be the oposite of this. As the camera goes upstairs it turns to the right and then shows the tunnel in which we drop towards the first inversion to be on the left hand side when you enter the trains.
Evostance wrote:clayj wrote:peter150496 wrote:Evostance wrote:http://www.towerstimes.co.uk/updates/full2.jpg
What is that silo buried in the ground under the crane/concrete pourer arm..
I'm pretty sure it's a waste silo. it look like ground waste pipe running from then running toward the station.
Wrong shape for toilet waste.... A toilet block of that size would go to a mains... its too far away from thew toilet and who intheir right mind would put a waste silo in the middle of a ride ??
It looks more to me like a compressed air tank commonly used in coasters - Which again, would make sense as its next to the 2nd lifthill..
A quick Google suggests its either a 'soil' pipe or some form of gas like, hydrogen, oxygen etc
AndreJD wrote:RCT3Bross wrote:simononestop wrote:worryingly still quite a bit of water in bottom,the first drop from station, the straight under the first lift hill and the plazza?
Also where do you get on the train and off? you can see the floor being costructed (pict 5) next to the station before the first drop. it just seems to be in a corner you normall enter one side exit the other?? not sure?
like this ???
If you look at the game sneak peak it looks to be the oposite of this. As the camera goes upstairs it turns to the right and then shows the tunnel in which we drop towards the first inversion to be on the left hand side when you enter the trains.
Makes more sense too as there doesn't look to be enough space on that diagram for air gates and space for boarding. Has to be the other side of the track.
simononestop wrote:AndreJD wrote:RCT3Bross wrote:simononestop wrote:worryingly still quite a bit of water in bottom,the first drop from station, the straight under the first lift hill and the plazza?
Also where do you get on the train and off? you can see the floor being costructed (pict 5) next to the station before the first drop. it just seems to be in a corner you normall enter one side exit the other?? not sure?
like this ???
If you look at the game sneak peak it looks to be the oposite of this. As the camera goes upstairs it turns to the right and then shows the tunnel in which we drop towards the first inversion to be on the left hand side when you enter the trains.
Makes more sense too as there doesn't look to be enough space on that diagram for air gates and space for boarding. Has to be the other side of the track.
yeah would make sense but then the exit wouldnt go over the rumored glass floor/shop area??
unless you load unload the same side like saw i guess you get off eariler. and never go over to the far side?? thats for the control room ect?
aircanman wrote:As people are saying the lift hills are inverted, could the 'washing machine' element be right in front of the lift hills? There could even be two of them, so just before you reach the chain, the train stops in the element, and it starts to spin, and when the car stops upside down, it makes riders think (marmalises) that the coaster has done something wrong, as it continues to lift them inverted.
RCT3Bross wrote:aircanman wrote:As people are saying the lift hills are inverted, could the 'washing machine' element be right in front of the lift hills? There could even be two of them, so just before you reach the chain, the train stops in the element, and it starts to spin, and when the car stops upside down, it makes riders think (marmalises) that the coaster has done something wrong, as it continues to lift them inverted.
Who told you the lifts are inverted? That isn't even healthy. The hills are both normal one on a 45 degree angle and the other on a 90 degree angle.They both make a small drop in the top and than both make a inversion that ends in the drop.
aircanman wrote:RCT3Bross wrote:aircanman wrote:As people are saying the lift hills are inverted, could the 'washing machine' element be right in front of the lift hills? There could even be two of them, so just before you reach the chain, the train stops in the element, and it starts to spin, and when the car stops upside down, it makes riders think (marmalises) that the coaster has done something wrong, as it continues to lift them inverted.
Who told you the lifts are inverted? That isn't even healthy. The hills are both normal one on a 45 degree angle and the other on a 90 degree angle.They both make a small drop in the top and than both make a inversion that ends in the drop.
It looks like you posted this in the last page ....
" It really gets me how many people have noticed that the drop after the vertical lift is a inverted drop in the same shocked way. I mean that fact is like a 100 times mentioned as a inverted drop. But not only that part, there are many other parts which crack my head open because they mention something told like a 1000 times as: Some shocking discovery they made. It just gives me the feeling they never read any post then replies on theirs. Sometimes it just really no trouble at all to find out that it was discovered. "
Phild94 wrote:chrisbacktothe80s wrote:My first post, so as always prob wrong but looking at the hi-res pics it appears people are right, and the spider will move as well as having some sort of effect as can be seen by the 3/4 hydrolic lines in front of the cement pump as well as the blue gas/water pipe leading from the pressure vessel towards the same place as the hydrolic lines ?
No offence to you personally but I need to say I really wish people would stop saying its gonna move and realise it IS static.... It specifies this in the planning permission
RCT3Bross wrote:aircanman wrote:RCT3Bross wrote:aircanman wrote:As people are saying the lift hills are inverted, could the 'washing machine' element be right in front of the lift hills? There could even be two of them, so just before you reach the chain, the train stops in the element, and it starts to spin, and when the car stops upside down, it makes riders think (marmalises) that the coaster has done something wrong, as it continues to lift them inverted.
Who told you the lifts are inverted? That isn't even healthy. The hills are both normal one on a 45 degree angle and the other on a 90 degree angle.They both make a small drop in the top and than both make a inversion that ends in the drop.
It looks like you posted this in the last page ....
" It really gets me how many people have noticed that the drop after the vertical lift is a inverted drop in the same shocked way. I mean that fact is like a 100 times mentioned as a inverted drop. But not only that part, there are many other parts which crack my head open because they mention something told like a 1000 times as: Some shocking discovery they made. It just gives me the feeling they never read any post then replies on theirs. Sometimes it just really no trouble at all to find out that it was discovered. "
Yeah I mention the inverted drop. But I really see nothing about a inverted hill in that post. Or you try to make an other point which I can't see.(Cause I didn't say: Look I looks like both drops get inverted drops that's new.
)