MakoMania wrote:
Was this massive trench that is being dug shown on the planning applications?

If the trench is this then they are simply clearing down ready to start the foundations for supports I guess.

Image
Formerly known under username Andy Mc
 
User avatar
PhNx Survivor
TT Member
TT Member
Posts: 432
Joined: November 2012
Location: Derby

Re: SW8 Construction Discussion

Tue Jun 27, 2017 9:53 am

The height markings and line difference show it to be quite close to the ground at some points, apart from that 'trench', the corners near the station, and the surrounding foundations of 'Themeing Envelope 2'. That is the last of the foundations right?
 
User avatar
Owen
TT Member
TT Member
Posts: 3016
Joined: March 2012
Location: South East

Re: SW8 Construction Discussion

Tue Jun 27, 2017 9:56 am

Liftaunch hill is going up...

Image

Image

Image

Image

Credit to Theme Park Guide.
Image
 
User avatar
PhNx Survivor
TT Member
TT Member
Posts: 432
Joined: November 2012
Location: Derby

Re: SW8 Construction Discussion

Tue Jun 27, 2017 10:01 am

That looks steeper than I thought it would be.. :-s
 
TheDuke
TT Member
TT Member
Posts: 204
Joined: December 2016
Location: Dublin

Re: SW8 Construction Discussion

Tue Jun 27, 2017 11:19 am

Exciting, the other stuff is cool thats been built but this just makes it seem more real to me
 
User avatar
Owen
TT Member
TT Member
Posts: 3016
Joined: March 2012
Location: South East

Re: SW8 Construction Discussion

Tue Jun 27, 2017 11:53 am

More has gone up...

Image

Credit to Theme Park Guide.
Image
 
simononestop
TT Member
TT Member
Posts: 197
Joined: June 2009
Location: Hastings

Re: SW8 Construction Discussion

Tue Jun 27, 2017 11:57 am

PhNx Survivor wrote:
That looks steeper than I thought it would be..  :-s

just what I was thinking. I guess it flattens out over the concrete block/launch/mechanics then goes up again
 
User avatar
Dom
Fabulous
Fabulous
Posts: 2611
Joined: December 2010
Location: Salisbury, Wiltshire
Contact:

Re: SW8 Construction Discussion

Tue Jun 27, 2017 11:59 am

Its getting rather exciting at Towers now. They are really cracking on with building it. I guess the good weather has helped an awful lot too to get the foundations etc done. We may actually get an early opening date for this if they carry on at the speed they are going.
 
User avatar
Owen
TT Member
TT Member
Posts: 3016
Joined: March 2012
Location: South East

Re: SW8 Construction Discussion

Tue Jun 27, 2017 12:08 pm

simononestop wrote:
PhNx Survivor wrote:
That looks steeper than I thought it would be..  :-s

just what I was thinking. I guess it flattens out over the concrete block/launch/mechanics then goes up again


As far as I can remember, The hill is expected to start fairly steep, then around a third of the way up the angle is made smaller for the remainder of the hill. :)
Image
 
User avatar
lewis97
Team TTSP
Team TTSP
Posts: 4389
Joined: November 2012
Location: Hertfordshire

Re: SW8 Construction Discussion

Tue Jun 27, 2017 12:20 pm

Owen wrote:
simononestop wrote:
PhNx Survivor wrote:
That looks steeper than I thought it would be..  :-s

just what I was thinking. I guess it flattens out over the concrete block/launch/mechanics then goes up again


As far as I can remember, The hill is expected to start fairly steep, then around a third of the way up the angle is made smaller for the remainder of the hill. :)

I do also think its gradient is seeming steeper as a result of the (possibly temporary) bracing between the bents. Crudely drawing a line between the track support on each bent gives a better idea of how steep it'll actually be, as well as indicating where the gradient will potentially change.

Image
Image
 
User avatar
PhNx Survivor
TT Member
TT Member
Posts: 432
Joined: November 2012
Location: Derby

Re: SW8 Construction Discussion

Tue Jun 27, 2017 12:29 pm

lewis97 wrote:
Owen wrote:
simononestop wrote:
just what I was thinking. I guess it flattens out over the concrete block/launch/mechanics then goes up again


As far as I can remember, The hill is expected to start fairly steep, then around a third of the way up the angle is made smaller for the remainder of the hill. :)

I do also think its gradient is seeming steeper as a result of the (possibly temporary) bracing between the bents. Crudely drawing a line between the track support on each bent gives a better idea of how steep it'll actually be, as well as indicating where the gradient will potentially change.


Sounds good to me.. if this is the case then with the gradient changing a third of the way, is the launch lift all of the lift or a section?
 
User avatar
Owen
TT Member
TT Member
Posts: 3016
Joined: March 2012
Location: South East

Re: SW8 Construction Discussion

Tue Jun 27, 2017 12:55 pm

I think that's a discussion best for the speculation topic because no one knows yet!
Image
 
User avatar
lewis97
Team TTSP
Team TTSP
Posts: 4389
Joined: November 2012
Location: Hertfordshire

Re: SW8 Construction Discussion

Tue Jun 27, 2017 12:59 pm

On the left-hand side of another image posted by Theme Park Guide it can also be seen that the supports for the turn between the maintenance and station buildings are being installed today. Presumably this is the wood that has been sitting in the pre-show area.

Image
Image
 
User avatar
PhNx Survivor
TT Member
TT Member
Posts: 432
Joined: November 2012
Location: Derby

Re: SW8 Construction Discussion

Tue Jun 27, 2017 1:32 pm

Owen wrote:
I think that's a discussion best for the speculation topic because no one knows yet!


Ah okay.. never mind then :D time will tell!
 
User avatar
Owen
TT Member
TT Member
Posts: 3016
Joined: March 2012
Location: South East

Re: SW8 Construction Discussion

Tue Jun 27, 2017 4:48 pm

Approximately half is up now...

Image

Image

Image

Credit to TPG.
Image
 
OhShambhala
TT Member
TT Member
Posts: 134
Joined: May 2016

Re: SW8 Construction Discussion

Tue Jun 27, 2017 5:15 pm

Its suddenly dawning on me that Alton Towers is getting a woodie after so many years of wanting one. I never thought I'd see the day!
Airtime Machine, Shambhala!
 
Jayvk_
TT Member
TT Member
Posts: 9
Joined: February 2014
Location: Coventry
Contact:

Re: SW8 Construction Discussion

Tue Jun 27, 2017 6:22 pm

Never thought we'd genuinely see a woodie going up at Towers, I can't believe it. Like many other here, it's really dawning on me what's happening now.
 
User avatar
lewis97
Team TTSP
Team TTSP
Posts: 4389
Joined: November 2012
Location: Hertfordshire

Re: SW8 Construction Discussion

Tue Jun 27, 2017 10:19 pm

The following photo was posted in the MAP Facebook group showing that today's construction saw bents for the lift/launch hill go up until just past the concrete block. It's also just possible to make out the roof trusses that have gone in for the Comms Building, with work on this also shown in the previously posted photos from Theme Park Guide.

Image
Image
 
User avatar
Robert.W
TT Member
TT Member
Posts: 1202
Joined: May 2017

Re: SW8 Construction Discussion

Tue Jun 27, 2017 11:10 pm

I can't wait to see the progress when I visit in July! It's seeming like it's going to be a fast construction from what I'm seeing on this page; station, theming and track getting constructed so far! I hope lots of progress is made by the time I visit. I may get some photos too...
Image

Image
Image
 
T0mPr1ce
TT Member
TT Member
Posts: 143
Joined: December 2016

Re: SW8 Construction Discussion

Wed Jun 28, 2017 12:28 am

What is the actual purpose of the change in gradient?